Rear wall preparation - Jul 28, 2003

rearwallpreparationjul282003.jpg

Rear wall being fitted for diagonal brace which is flush cut into the studs. Very strong and looks pretty from inside the shed. Note the compression straps holding top beam & sill plate in place.

Photo album created with Web Album Generator